Eastern Regional Load Despatch Centre
|
|
|
|
|
|
|
ER Grid Frequency
|
50.08
Hz
|
Current Schedule Rev No.
|
|
UI Rate
|
82.5
Paise
|
8
View changes in last revision
|
ER Demand Met
|
12514.7
MW
|
|
REV-8 TSTPP-I B(37-96)/WB SURRENDER FRPM TSTP-I B(37-40).
|
Last Updated Time : 24-May-2013 08:36:39 AM
|
|
UPDATES
|
|
|
|
|
|
RLDC is the apex body to ensure integrated operation of the power system in the Eastern Region.
The main responsibilities of ERLDC are ::-
|
|
|
|
|
Reliability, Security and Economy in Power System Operation
|
|
|
Best viewed with 1024 by 768 Screen Resolution
: ©2000-2010 POWERGRID
|
|