Eastern Regional Load Despatch Centre
         Skip Navigation Links
About UsExpand About Us
MapsExpand Maps
RTI 2005
RLDCs / NLDCExpand RLDCs / NLDC
Contact Us
Label
Skip Navigation Links
Home
ATC /TTCExpand ATC /TTC
SchedulingExpand Scheduling
Open AccessExpand Open Access
CommercialExpand Commercial
DocumentsExpand Documents
Reports ArchieveExpand Reports Archieve
TL OutagesExpand TL Outages
REC Mechanism
Weather
Other LinksExpand Other Links
ERLDC Intranet
Hindi Website
ER Grid Frequency 49.81  Hz Current Schedule Rev No.
UI Rate 574.0  Paise 39
View changes in last revision
ER Demand Met
15222.2  MW
1 REV_TEXT
Last Updated Time : 24-July-2014 10:18:01 PM

UPDATES
INFORMATION
RLDC is the apex body to ensure integrated operation of the power system in the Eastern Region. The main responsibilities of ERLDC are ::-
• Monitoring of system parameters and security. • To ensure the integrated operation of the power system grid in the region. • System studies, planning and contingency analysis. • Analysis of tripping disturbances and facilitating immediate remedial measures. • Daily scheduling and operational planning. • Facilitating bilateral and inter-regional exchanges. • Computation of energy dispatch and drawal values using SEMs. • Augmentation of telemetry, computing and communication facilities.
Reliability, Security and Economy in Power System Operation
Best viewed with 1024 by 768 Screen Resolution : ©2000-2010 POWERGRID