Power Grid Corporation of India Limited

The Central Transmission Utility of India
 Eastern Regional Load Despatch Centre 
Skip Navigation Links
About UsExpand About Us
MapsExpand Maps
RIA 2005
RLDCs / NLDCExpand RLDCs / NLDC
Contact Us
Skip Navigation Links
Home
SchedulingExpand Scheduling
Open AccessExpand Open Access
CommercialExpand Commercial
ReportsExpand Reports
Weather
Useful Links
ERLDC Intranet
Complaints
Feedback
Search
Disclaimer
Webmaster

Details Of Schedule Vs Actual Drawal For Generating Stations...
ER Grid Frequency
49.45 
Last Updated on Date: 12/03/2010
Time: 12:35:49


Sr. No. Generating Station  Schedule (MW) Actual (MW)
1 Farakka STPS   1100.0   1121.1
2 Kahalgaon STPS -I   1290.0   542.4
3 Kahalgaon STPS - II   150.8   1129.9
4 Talcher STPS   925.0   952.4
5 Kurichu HPS   4.4   0.0
6 Tala + Chukha HPS   20   79.2
7 Rangit HPS   0.0   0.5
8 Talcher Stage II     1949.5
9 Teesta   0.0   0.0


(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations in Eastern Region over existing communication links.)

Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2009 POWERGRID