Details Of Schedule Vs Actual Drawal For Generating Stations...
|
ER Grid Frequency
49.02
|
Last Updated on Date: 08/09/2008
Time: 02:13:00 |
|
|
Sr. No.
|
Generating Station |
Schedule (MW) |
Actual (MW) |
|
1 |
Farakka STPS |
835.0 |
849.6 |
|
2 |
Kahalgaon STPS -I |
535.0 |
537.5 |
|
3 |
Kahalgaon STPS - II |
0.0 |
0.0 |
|
4 |
Talcher STPS |
463.0 |
472.8 |
|
5 |
Kurichu HPS |
39.5 |
35.0 |
|
6 |
Tala +
Chukha HPS |
1405 |
1398.7 |
|
7 |
Rangit HPS |
59.4 |
62.0 |
|
8 |
Talcher Stage II |
|
1865.8 |
|
9 |
Teesta |
504.0 |
496.2 |
|